WellplannerNorwegian shelf well data

Fields / 2/11-12 A

2/11-12 A

Exploration, wildcatPlugged and abandonedDry

Drilled by Aker BP ASA with Maersk Interceptor, 13.02.2019 to 07.03.2019 (22 days), to 3 427,0 m in the Zechstein Group.

Water depth70,5 m
Total depth3 427,0 m MD
Vertical depth3 245,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table55,0 m
Formation at total depthZechstein Group
RigMaersk Interceptor
Spud13.02.2019
Completed07.03.2019
OperatorAker BP ASA
Position56,1697 N, 3,4368 E

Formations

24 tops reported, measured depth in metres.

GroupsNordland Group, top 125,5 mNordland GpHordaland Group, top 1 508,0 mHordaland GpRogaland Group, top 2 887,5 mShetland Group, top 2 987,5 mCromer Knoll Group, top 3 060,0 mTyne Group, top 3 140,0 mTyne GpZechstein Group, top 3 390,0 mFormationsUndifferentiated, top 125,5 mUndifferentiatedNo Formal Name, top 1 508,0 mNo Formal NameLista Formation, top 2 146,0 mNo Formal Name, top 2 162,5 mNo Formal NameBalder Formation, top 2 887,5 mSele Formation, top 2 903,5 mVåle Formation, top 2 964,5 mEkofisk Formation, top 2 987,5 mTor Formation, top 3 001,0 mNo Formal Name, top 3 009,0 mHod Formation, top 3 026,0 mBlodøks Formation, top 3 058,5 mRødby Formation, top 3 060,0 mSola Formation, top 3 082,0 mTuxen Formation, top 3 090,0 mÅsgard Formation, top 3 114,0 mMandal Formation, top 3 140,0 mMandal Fm1261 0002 0003 0003 427

Temperature

Reported at total depth-

The wellbore is not in a field, so no field gradient applies.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
2/11-12 S same well0,02 956,0-1,752019
2/11-50,42 945,0106 °C1,801979
2/11-21,52 806,067 °C1,801974
2/11-A-11,64 723,0--1991
2/11-A-1 A1,64 137,0--1991
2/11-A-1 B1,63 823,0--1994
2/11-A-81,63 712,0--1995
2/11-A-8 A1,64 611,0--1995

Casing and formation tests

The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.

StringCasingShoe, mHoleHole depth, mTest, g/cm³
Conductor20"535,826"541,01,63 LOT
Pilot hole-540,09 7/8"540,0-
Intermediate13 3/8"1 426,416"1 435,01,95 LOT
Intermediate9 7/8"3 082,812 1/4"3 090,01,98 FIT
Open hole-3 427,08 1/2"3 427,0-

Mud weight

13 measurements, one dot each, 1,00 to 1,79 g/cm³ against measured depth, rheguard prime, sea water, warp.

1,01,21,41,61,801 0002 0003 000130,0 m: 1,02 g/cm³, Sea water428,0 m: 1,57 g/cm³, RheGuard Prime1 210,0 m: 1,02 g/cm³, Sea water1 370,0 m: 1,74 g/cm³, RheGuard Prime1 943,0 m: 1,73 g/cm³, RheGuard Prime2 550,0 m: 1,74 g/cm³, RheGuard Prime3 080,0 m: 1,73 g/cm³, RheGuard Prime3 090,0 m: 1,73 g/cm³, RheGuard Prime3 090,0 m: 1,79 g/cm³, Warp3 140,0 m: 1,79 g/cm³, Warp3 254,0 m: 1,78 g/cm³, Warp3 426,0 m: 1,78 g/cm³, Warp3 426,0 m: 1,74 g/cm³, Warp
Show on the mapOpen on FactPages ↗