2/11-12 S
Exploration, appraisalPlugged and abandonedDry
Drilled by Aker BP ASA with Maersk Interceptor in Hod, 10.01.2019 to 12.02.2019 (33 days), to 2 956,0 m in the Hidra Formation.
Water depth70,5 m
Total depth2 956,0 m MD
Vertical depth2 939,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table55,0 m
Formation at total depthHidra Formation
RigMaersk Interceptor
Spud10.01.2019
Completed12.02.2019
OperatorAker BP ASA
Position56,1697 N, 3,4368 E
Formations
15 tops reported, measured depth in metres.
Temperature
| Reported at total depth | - |
| Hod gradient | 35,4 °C/km |
| Estimated at total depth from the gradient | 104 °C |
The gradient is the median of 6 released wells in Hod with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/11-12 A same well | 0,0 | 3 427,0 | - | 1,79 | 2019 |
| 2/11-5 | 0,4 | 2 945,0 | 106 °C | 1,80 | 1979 |
| 2/11-2 | 1,5 | 2 806,0 | 67 °C | 1,80 | 1974 |
| 2/11-A-1 | 1,6 | 4 723,0 | - | - | 1991 |
| 2/11-A-1 A | 1,6 | 4 137,0 | - | - | 1991 |
| 2/11-A-1 B | 1,6 | 3 823,0 | - | - | 1994 |
| 2/11-A-8 | 1,6 | 3 712,0 | - | - | 1995 |
| 2/11-A-8 A | 1,6 | 4 611,0 | - | - | 1995 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 20" | 535,8 | 26" | 541,0 | 1,63 LOT |
| Pilot hole | - | 540,0 | 9 7/8" | 540,0 | - |
| Intermediate | 13 3/8" | 1 426,4 | 16" | 1 435,0 | 1,95 LOT |
| Open hole | - | 2 955,7 | 8 1/2" | 2 955,7 | - |
Mud weight
15 measurements, one dot each, 1,00 to 1,75 g/cm³ against measured depth, bentonite, glydril wbm/ displacementmud., rheguard prime, sea water in well..