WellplannerNorwegian shelf well data

Fields / Hod / 2/11-A-3 A

2/11-A-3 A

Development, productionPlugged and abandonedOil

Drilled by Amoco Norway Oil Company with Kolskaya in Hod, 15.05.1991 to 24.05.1991 (9 days), to 3 811,0 m.

Water depth72,0 m
Total depth3 811,0 m MD
Vertical depth2 837,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table38,3 m
Formation at total depth-
RigKolskaya
Spud15.05.1991
Completed24.05.1991
OperatorAmoco Norway Oil Company
Position56,1767 N, 3,4601 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Hod gradient35,4 °C/km
Estimated at total depth from the gradient101 °C

The gradient is the median of 6 released wells in Hod with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
2/11-A-3 same well0,03 332,0--1991
2/11-A-20,03 701,0--1990
2/11-A-10,04 723,0--1991
2/11-A-1 A0,04 137,0--1991
2/11-A-1 B0,03 823,0--1994
2/11-A-40,04 100,0--1990
2/11-10 S0,04 090,0102 °C1,761994
2/11-A-50,04 090,0--1994

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗