WellplannerNorwegian shelf well data

Fields / Hod / 2/11-U-17

2/11-U-17

Other, shallow gasPlugged

Drilled by Aker BP ASA with Maersk Invincible in Hod, 01.09.2020 to 01.09.2020 (0 days), to 530,0 m.

Water depth73,0 m
Total depth530,0 m MD
Vertical depth530,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table57,0 m
Formation at total depth-
RigMaersk Invincible
Spud01.09.2020
Completed01.09.2020
OperatorAker BP ASA
Position56,1799 N, 3,4657 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Hod gradient35,4 °C/km
Estimated at total depth from the gradient18 °C

The gradient is the median of 6 released wells in Hod with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
2/11-B-10,1----
2/11-B-40,1----
2/11-B-20,15 683,0--2022
2/11-B-70,1----
2/11-B-50,14 064,0--2021
2/11-B-5 A0,13 600,0--2021
2/11-B-30,14 777,0--2021
2/11-B-100,1----

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗