WellplannerNorwegian shelf well data

Fields / Ekofisk / 2/4-B-3 A

2/4-B-3 A

Development, productionPluggedOil

Drilled by Phillips Petroleum Company Norway with Ekofisk B in Ekofisk, 10.10.1988 to 05.11.1988 (26 days), to 4 191,0 m.

Water depth71,0 m
Total depth4 191,0 m MD
Vertical depth3 282,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table33,0 m
Formation at total depth-
RigEkofisk B
Spud10.10.1988
Completed05.11.1988
OperatorPhillips Petroleum Company Norway
Position56,5652 N, 3,2039 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Ekofisk gradient38,0 °C/km
Estimated at total depth from the gradient125 °C

The gradient is the median of 6 released wells in Ekofisk with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
2/4-B-3 same well0,04 161,0--1974
2/4-B-3 B same well0,04 070,0--2004
2/4-B-40,03 380,2--1989
2/4-B-4 A0,03 429,0--2005
2/4-B-20,04 697,6--1975
2/4-B-2 A0,04 267,0--1988
2/4-B-2 B0,03 597,0--2002
2/4-B-2 C0,03 899,0--2010

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗