2/4-B-3
Development, productionPluggedOil
Drilled by Phillips Petroleum Company Norway with Ekofisk B in Ekofisk, 28.06.1974 to 17.09.1974 (81 days), to 4 161,0 m.
Water depth71,0 m
Total depth4 161,0 m MD
Vertical depth3 322,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table33,0 m
Formation at total depth-
RigEkofisk B
Spud28.06.1974
Completed17.09.1974
OperatorPhillips Petroleum Company Norway
Position56,5652 N, 3,2039 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Ekofisk gradient | 38,0 °C/km |
| Estimated at total depth from the gradient | 126 °C |
The gradient is the median of 6 released wells in Ekofisk with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.