2/4-B-3 B
Development, productionPluggedOil
Drilled by ConocoPhillips Skandinavia AS with Mærsk Gallant in Ekofisk, 26.03.2004 to 23.04.2004 (28 days), to 4 070,0 m.
Water depth73,0 m
Total depth4 070,0 m MD
Vertical depth3 314,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table51,0 m
Formation at total depth-
RigMærsk Gallant
Spud26.03.2004
Completed23.04.2004
OperatorConocoPhillips Skandinavia AS
Position56,5652 N, 3,2039 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Ekofisk gradient | 38,0 °C/km |
| Estimated at total depth from the gradient | 125 °C |
The gradient is the median of 6 released wells in Ekofisk with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.