WellplannerNorwegian shelf well data

Fields / Fenris / 2/4-FE-8 A

2/4-FE-8 A

Development, productionClosedGas and condensate

Drilled by Aker BP ASA with Noble Integrator in Fenris, 30.04.2025 to 08.06.2025 (39 days), to 5 979,0 m.

Water depth68,3 m
Total depth5 979,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table63,9 m
Formation at total depth-
RigNoble Integrator
Spud30.04.2025
Completed08.06.2025
OperatorAker BP ASA
Position56,6999 N, 3,1190 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Fenris gradient34,9 °C/km
Estimated at total depth from the gradient208 °C

The gradient is the median of 3 released wells in Fenris with a reported bottom-hole temperature, counted from 4 °C at the sea floor. The vertical depth is not reported, so the measured depth is used and the estimate errs high.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
2/4-FE-8 same well0,05 534,0--2025
2/4-FE-60,05 317,0--2025
2/4-FE-30,05 577,0--2024
2/4-FE-20,05 645,0--2024
2/4-U-770,01 222,0--2021
2/4-U-320,991,0--2011
2/4-U-311,0103,0--2011
2/4-U-331,0103,0--2011

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗