Fields / 2/4-U-31
2/4-U-31
Other, soil drillingPlugged and abandoned
Drilled by Statoil Petroleum AS with Bucentaur, 07.06.2011 to 07.06.2011 (0 days), to 103,0 m.
Water depth68,0 m
Total depth103,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table-
Formation at total depth-
RigBucentaur
Spud07.06.2011
Completed07.06.2011
OperatorStatoil Petroleum AS
Position56,7043 N, 3,1324 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.