2/4-K-20
Development, injectionPluggedWater
Drilled by Phillips Petroleum Company Norway with Ekofisk K in Ekofisk, 18.09.1987 to 28.11.1988 (437 days), to 4 030,7 m.
Water depth71,0 m
Total depth4 030,7 m MD
Vertical depth3 371,6 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table57,0 m
Formation at total depth-
RigEkofisk K
Spud18.09.1987
Completed28.11.1988
OperatorPhillips Petroleum Company Norway
Position56,5655 N, 3,2061 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Ekofisk gradient | 38,0 °C/km |
| Estimated at total depth from the gradient | 127 °C |
The gradient is the median of 6 released wells in Ekofisk with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/4-K-20 A same well | 0,0 | 3 981,0 | - | - | 2011 |
| 2/4-K-20 AY2 same well | 0,0 | 4 340,0 | - | - | 2023 |
| 2/4-K-20 AY3 same well | 0,0 | 4 489,0 | - | - | 2023 |
| 2/4-K-19 | 0,0 | 4 332,7 | - | - | 1989 |
| 2/4-K-19 A | 0,0 | 4 267,0 | - | - | 2006 |
| 2/4-K-10 | 0,0 | 4 277,9 | - | - | 1988 |
| 2/4-K-10 A | 0,0 | 4 281,5 | - | - | 1998 |
| 2/4-K-10 BY1 | 0,0 | 4 206,0 | - | - | 2019 |
Casing and formation tests
No casing programme is reported for this wellbore.