2/4-K-19
Development, injectionPluggedWater
Drilled by Phillips Petroleum Company Norway with Ekofisk K in Ekofisk, 16.02.1989 to 20.06.1989 (124 days), to 4 332,7 m.
Water depth71,0 m
Total depth4 332,7 m MD
Vertical depth3 352,5 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table57,0 m
Formation at total depth-
RigEkofisk K
Spud16.02.1989
Completed20.06.1989
OperatorPhillips Petroleum Company Norway
Position56,5655 N, 3,2061 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Ekofisk gradient | 38,0 °C/km |
| Estimated at total depth from the gradient | 127 °C |
The gradient is the median of 6 released wells in Ekofisk with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/4-K-19 A same well | 0,0 | 4 267,0 | - | - | 2006 |
| 2/4-K-20 | 0,0 | 4 030,7 | - | - | 1987 |
| 2/4-K-20 A | 0,0 | 3 981,0 | - | - | 2011 |
| 2/4-K-20 AY2 | 0,0 | 4 340,0 | - | - | 2023 |
| 2/4-K-20 AY3 | 0,0 | 4 489,0 | - | - | 2023 |
| 2/4-K-29 | 0,0 | 3 817,0 | - | - | 1989 |
| 2/4-K-29 A | 0,0 | 4 252,0 | - | - | 2009 |
| 2/4-K-9 | 0,0 | 3 798,0 | - | - | 1987 |
Casing and formation tests
No casing programme is reported for this wellbore.