2/4-K-29
Development, injectionPluggedWater
Drilled by Phillips Petroleum Company Norway with Ekofisk K in Ekofisk, 19.01.1989 to 24.08.1989 (217 days), to 3 817,0 m.
Water depth71,0 m
Total depth3 817,0 m MD
Vertical depth3 401,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table57,0 m
Formation at total depth-
RigEkofisk K
Spud19.01.1989
Completed24.08.1989
OperatorPhillips Petroleum Company Norway
Position56,5655 N, 3,2061 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Ekofisk gradient | 38,0 °C/km |
| Estimated at total depth from the gradient | 129 °C |
The gradient is the median of 6 released wells in Ekofisk with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/4-K-29 A same well | 0,0 | 4 252,0 | - | - | 2009 |
| 2/4-K-19 | 0,0 | 4 332,7 | - | - | 1989 |
| 2/4-K-19 A | 0,0 | 4 267,0 | - | - | 2006 |
| 2/4-K-28 | 0,0 | 3 782,0 | - | - | 1987 |
| 2/4-K-28 A | 0,0 | 4 225,0 | - | - | 2010 |
| 2/4-K-28 AY2 | 0,0 | 4 549,0 | - | - | 2023 |
| 2/4-K-28 AY3 | 0,0 | 4 525,0 | - | - | 2023 |
| 2/4-K-30 | 0,0 | 3 733,5 | - | - | 1987 |
Casing and formation tests
No casing programme is reported for this wellbore.