2/4-K-19 A
Development, injectionInjectingWater
Drilled by ConocoPhillips Skandinavia AS with Ekofisk K in Ekofisk, 09.09.2006 to 30.11.2006 (82 days), to 4 267,0 m.
Water depth71,3 m
Total depth4 267,0 m MD
Vertical depth3 491,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table55,2 m
Formation at total depth-
RigEkofisk K
Spud09.09.2006
Completed30.11.2006
OperatorConocoPhillips Skandinavia AS
Position56,5655 N, 3,2061 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Ekofisk gradient | 38,0 °C/km |
| Estimated at total depth from the gradient | 132 °C |
The gradient is the median of 6 released wells in Ekofisk with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/4-K-19 same well | 0,0 | 4 332,7 | - | - | 1989 |
| 2/4-K-20 | 0,0 | 4 030,7 | - | - | 1987 |
| 2/4-K-20 A | 0,0 | 3 981,0 | - | - | 2011 |
| 2/4-K-20 AY2 | 0,0 | 4 340,0 | - | - | 2023 |
| 2/4-K-20 AY3 | 0,0 | 4 489,0 | - | - | 2023 |
| 2/4-K-29 | 0,0 | 3 817,0 | - | - | 1989 |
| 2/4-K-29 A | 0,0 | 4 252,0 | - | - | 2009 |
| 2/4-K-9 | 0,0 | 3 798,0 | - | - | 1987 |
Casing and formation tests
No casing programme is reported for this wellbore.