2/4-K-9 B
Development, injectionInjecting
Drilled by ConocoPhillips Skandinavia AS with Ekofisk K in Ekofisk, 19.12.2024 to 05.02.2025 (48 days), to 3 780,0 m.
Water depth74,0 m
Total depth3 780,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table55,0 m
Formation at total depth-
RigEkofisk K
Spud19.12.2024
Completed05.02.2025
OperatorConocoPhillips Skandinavia AS
Position56,5655 N, 3,2062 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Ekofisk gradient | 38,0 °C/km |
| Estimated at total depth from the gradient | 143 °C |
The gradient is the median of 6 released wells in Ekofisk with a reported bottom-hole temperature, counted from 4 °C at the sea floor. The vertical depth is not reported, so the measured depth is used and the estimate errs high.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.