Fields / 2/4-U-37
2/4-U-37
Other, soil drillingPlugged and abandoned
Drilled by Phillips Petroleum Company Norway with Bucentaur, 21.06.1994 to 22.06.1994 (1 days), to 140,0 m.
Water depth77,0 m
Total depth140,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table2,9 m
Formation at total depth-
RigBucentaur
Spud21.06.1994
Completed22.06.1994
OperatorPhillips Petroleum Company Norway
Position56,5476 N, 3,2185 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/4-X-21 A | 0,0 | 5 318,8 | - | - | 2024 |
| 2/4-X-21 Y1 | 0,0 | 5 720,0 | - | - | 2004 |
| 2/4-X-21 Y2 | 0,0 | 5 413,0 | - | - | 2004 |
| 2/4-X-17 | 0,0 | 4 488,0 | - | - | 2001 |
| 2/4-X-17 A | 0,0 | 4 553,0 | - | - | 2017 |
| 2/4-X-13 | 0,0 | 3 810,0 | - | - | 2002 |
| 2/4-X-13 A | 0,0 | 4 267,0 | - | - | 2004 |
| 2/4-X-10 | 0,0 | 4 471,0 | - | - | 1997 |
Casing and formation tests
No casing programme is reported for this wellbore.