Fields / Embla / 2/7-23 S
2/7-23 S
Exploration, appraisalPlugged and abandonedOil
Drilled by Phillips Petroleum Company Norway with West Delta in Embla, 15.05.1990 to 21.11.1990 (190 days), to 4 760,0 m in the No Group Defined.
Water depth71,0 m
Total depth4 760,0 m MD
Vertical depth4 466,0 m TVD
Bottom-hole temperature158 °C
Max inclination30,8°
Rotary table29,0 m
Formation at total depthNo Group Defined
RigWest Delta
Spud15.05.1990
Completed21.11.1990
OperatorPhillips Petroleum Company Norway
Position56,3333 N, 3,2482 E
Formations
20 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 158 °C |
| Embla gradient | 35,5 °C/km |
| Estimated at total depth from the gradient | 159 °C |
The gradient is the median of 7 released wells in Embla with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|
| 2/7-27 S | 0,0 | 4 801,0 | 168 °C | 2,10 | 1991 |
| 2/7-D-27 | 0,0 | 4 782,0 | - | - | 1991 |
| 2/7-D-6 | 0,0 | 4 889,0 | - | - | 1999 |
| 2/7-D-7 | 0,0 | 5 982,0 | - | - | 2005 |
| 2/7-D-9 | 0,0 | 4 736,0 | - | - | 1999 |
| 2/7-20 | 0,0 | 4 509,0 | 167 °C | 7,79 | 1987 |
| 2/7-20 R | 0,0 | 4 535,0 | - | 2,12 | 1991 |
| 2/7-D-20 | 0,0 | 4 535,0 | - | - | 1993 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|
| Conductor | 30" | 173,0 | 36" | 174,0 | - |
| Intermediate | 20" | 1 066,0 | 26" | 1 070,0 | 1,92 LOT |
| Intermediate | 13 3/8" | 2 559,0 | 17 1/2" | 2 600,0 | 2,02 LOT |
| Intermediate | 9 5/8" | 4 224,0 | 12 1/4" | 4 230,0 | 2,17 LOT |
| Liner | 6 5/8" | 4 758,0 | 8 1/2" | 4 760,0 | - |
Mud weight
179 measurements, one dot each, 0,80 to 2,16 g/cm³ against measured depth, oil based, water based.