2/7-D-9
Development, productionClosedOil
Drilled by Phillips Petroleum Company Norway with Mærsk Gallant in Embla, 14.06.1999 to 14.08.1999 (61 days), to 4 736,0 m.
Water depth70,7 m
Total depth4 736,0 m MD
Vertical depth4 571,1 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table52,7 m
Formation at total depth-
RigMærsk Gallant
Spud14.06.1999
Completed14.08.1999
OperatorPhillips Petroleum Company Norway
Position56,3332 N, 3,2482 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Embla gradient | 35,5 °C/km |
| Estimated at total depth from the gradient | 162 °C |
The gradient is the median of 7 released wells in Embla with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.