WellplannerNorwegian shelf well data

Fields / Eldfisk / 2/7-S-20 Y2

2/7-S-20 Y2

Development, productionProducingOil and gas

Drilled by ConocoPhillips Skandinavia AS with West Elara in Eldfisk, 02.02.2021 to 18.02.2021 (16 days), to 5 566,0 m.

Water depth72,1 m
Total depth5 566,0 m MD
Vertical depth2 954,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table81,6 m
Formation at total depth-
RigWest Elara
Spud02.02.2021
Completed18.02.2021
OperatorConocoPhillips Skandinavia AS
Position56,3735 N, 3,2630 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Eldfisk gradient34,0 °C/km
Estimated at total depth from the gradient99 °C

The gradient is the median of 7 released wells in Eldfisk with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
2/7-S-20 same well0,05 062,0--2020
2/7-S-190,04 837,0--2020
2/7-S-150,04 449,0--2015
2/7-S-250,04 886,0--2019
2/7-S-140,03 504,0--2014
2/7-S-14 A0,05 351,0--2025
2/7-S-240,05 396,0--2020
2/7-S-100,04 693,0--2016

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗