2/7-S-20
Development, productionProducingOil and gas
Drilled by ConocoPhillips Skandinavia AS with West Elara in Eldfisk, 17.12.2020 to 01.02.2021 (46 days), to 5 062,0 m.
Water depth72,1 m
Total depth5 062,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table81,6 m
Formation at total depth-
RigWest Elara
Spud17.12.2020
Completed01.02.2021
OperatorConocoPhillips Skandinavia AS
Position56,3735 N, 3,2630 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Eldfisk gradient | 34,0 °C/km |
| Estimated at total depth from the gradient | 171 °C |
The gradient is the median of 7 released wells in Eldfisk with a reported bottom-hole temperature, counted from 4 °C at the sea floor. The vertical depth is not reported, so the measured depth is used and the estimate errs high.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/7-S-20 Y2 same well | 0,0 | 5 566,0 | - | - | 2021 |
| 2/7-S-19 | 0,0 | 4 837,0 | - | - | 2020 |
| 2/7-S-15 | 0,0 | 4 449,0 | - | - | 2015 |
| 2/7-S-25 | 0,0 | 4 886,0 | - | - | 2019 |
| 2/7-S-14 | 0,0 | 3 504,0 | - | - | 2014 |
| 2/7-S-14 A | 0,0 | 5 351,0 | - | - | 2025 |
| 2/7-S-24 | 0,0 | 5 396,0 | - | - | 2020 |
| 2/7-S-10 | 0,0 | 4 693,0 | - | - | 2016 |
Casing and formation tests
No casing programme is reported for this wellbore.