Fields / 2/7-U-35
2/7-U-35
Other, soil drillingPlugged and abandoned
Drilled by Phillips Petroleum Company Norway with Dyvi Stena, 27.06.1988 to 28.06.1988 (1 days), to 145,0 m.
Water depth70,0 m
Total depth145,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table25,0 m
Formation at total depth-
RigDyvi Stena
Spud27.06.1988
Completed28.06.1988
OperatorPhillips Petroleum Company Norway
Position56,3333 N, 3,2483 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.