24/6-5 B
Development, observationPlugged and abandonedOil
Drilled by Aker BP ASA with Noble Integrator in Alvheim, 02.06.2024 to 07.06.2024 (5 days), to 2 280,0 m.
Water depth120,0 m
Total depth2 280,0 m MD
Vertical depth2 218,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table55,0 m
Formation at total depth-
RigNoble Integrator
Spud02.06.2024
Completed07.06.2024
OperatorAker BP ASA
Position59,5362 N, 1,9767 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Alvheim gradient | 31,8 °C/km |
| Estimated at total depth from the gradient | 69 °C |
The gradient is the median of 6 released wells in Alvheim with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 24/6-5 same well | 0,0 | 4 681,0 | 151 °C | 1,91 | 2024 |
| 24/6-5 A same well | 0,0 | 2 820,0 | - | - | 2024 |
| 24/6-U-1 | 0,0 | 557,0 | - | - | 2024 |
| 24/6-B-7 Y1H | 1,2 | 6 197,0 | - | - | 2021 |
| 24/6-B-7 Y2H | 1,2 | 6 190,0 | - | - | 2021 |
| 24/6-B-6 AH | 1,3 | 3 166,0 | - | - | 2018 |
| 24/6-B-6 BH | 1,3 | 3 427,0 | - | - | 2018 |
| 24/6-B-6 CY1H | 1,3 | 6 560,0 | - | - | 2018 |
Casing and formation tests
No casing programme is reported for this wellbore.