Fields / 24/6-U-1
24/6-U-1
Other, shallow gasPlugged and abandoned
Drilled by Aker BP ASA with Noble Integrator, 01.04.2024 to 03.04.2024 (2 days), to 557,0 m.
Water depth120,0 m
Total depth557,0 m MD
Vertical depth557,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table55,0 m
Formation at total depth-
RigNoble Integrator
Spud01.04.2024
Completed03.04.2024
OperatorAker BP ASA
Position59,5363 N, 1,9768 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 24/6-5 | 0,0 | 4 681,0 | 151 °C | 1,91 | 2024 |
| 24/6-5 A | 0,0 | 2 820,0 | - | - | 2024 |
| 24/6-5 B | 0,0 | 2 280,0 | - | - | 2024 |
| 24/6-B-7 Y1H | 1,2 | 6 197,0 | - | - | 2021 |
| 24/6-B-7 Y2H | 1,2 | 6 190,0 | - | - | 2021 |
| 24/6-B-6 AH | 1,2 | 3 166,0 | - | - | 2018 |
| 24/6-B-6 BH | 1,2 | 3 427,0 | - | - | 2018 |
| 24/6-B-6 CY1H | 1,2 | 6 560,0 | - | - | 2018 |
Casing and formation tests
No casing programme is reported for this wellbore.