Fields / 24/6-5
24/6-5
Exploration, wildcatPluggedDry
Drilled by Aker BP ASA with Noble Integrator, 03.04.2024 to 28.05.2024 (55 days), to 4 681,0 m in the Draupne Formation.
Water depth120,0 m
Total depth4 681,0 m MD
Vertical depth4 625,9 m TVD
Bottom-hole temperature151 °C
Max inclination1,2°
Rotary table55,0 m
Formation at total depthDraupne Formation
RigNoble Integrator
Spud03.04.2024
Completed28.05.2024
OperatorAker BP ASA
Position59,5362 N, 1,9767 E
Formations
26 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 151 °C |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 24/6-5 A same well | 0,0 | 2 820,0 | - | - | 2024 |
| 24/6-5 B same well | 0,0 | 2 280,0 | - | - | 2024 |
| 24/6-U-1 | 0,0 | 557,0 | - | - | 2024 |
| 24/6-B-7 Y1H | 1,2 | 6 197,0 | - | - | 2021 |
| 24/6-B-7 Y2H | 1,2 | 6 190,0 | - | - | 2021 |
| 24/6-B-6 AH | 1,3 | 3 166,0 | - | - | 2018 |
| 24/6-B-6 BH | 1,3 | 3 427,0 | - | - | 2018 |
| 24/6-B-6 CY1H | 1,3 | 6 560,0 | - | - | 2018 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Surface casing | 30" | 241,0 | 36" | 245,0 | 1,71 FIT |
| Intermediate | 20" | 1 405,0 | 26" | 1 410,0 | 1,94 LOT |
| Intermediate | 13 3/8" | 3 193,0 | 16 1/2" | 3 200,0 | 2,15 LOT |
| Intermediate | 10" | 4 441,0 | 12 1/4" | 4 448,0 | 2,07 LOT |
| Liner | 7 5/8" | 4 665,0 | 8 1/2" | 4 665,0 | 2,12 LOT |
| - | - | 4 665,0 | - | 4 665,0 | 2,03 XLOT |
| - | - | 4 665,0 | - | 4 665,0 | 2,13 LOT |
Mud weight
21 measurements, one dot each, 1,00 to 1,91 g/cm³ against measured depth, oil, water.