WellplannerNorwegian shelf well data

Fields / Alvheim / 24/6-B-1 CH

24/6-B-1 CH

Development, productionClosedOil

Drilled by Marathon Petroleum Norge AS with DEEPSEA BERGEN decom in Alvheim, 18.01.2007 to 13.02.2007 (26 days), to 4 765,0 m.

Water depth124,0 m
Total depth4 765,0 m MD
Vertical depth2 122,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table23,0 m
Formation at total depth-
RigDEEPSEA BERGEN decom
Spud18.01.2007
Completed13.02.2007
OperatorMarathon Petroleum Norge AS
Position59,5465 N, 1,9887 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Alvheim gradient31,8 °C/km
Estimated at total depth from the gradient67 °C

The gradient is the median of 6 released wells in Alvheim with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
24/6-B-1 AH same well0,03 070,0--2007
24/6-B-1 BH same well0,03 249,0--2007
24/6-B-1 H same well0,02 995,0--2006
24/6-B-3 AY1H0,05 012,0--2007
24/6-B-3 AY2H0,05 017,0--2008
24/6-B-3 H0,02 834,0--2007
24/6-B-2 AY1H0,04 713,0--2008
24/6-B-2 AY2H0,04 303,0--2008

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗