24/6-B-3 H
Development, observationPluggedOil
Drilled by Marathon Petroleum Norge AS with DEEPSEA BERGEN decom in Alvheim, 09.04.2007 to 21.04.2007 (12 days), to 2 834,0 m.
Water depth123,0 m
Total depth2 834,0 m MD
Vertical depth2 286,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table23,0 m
Formation at total depth-
RigDEEPSEA BERGEN decom
Spud09.04.2007
Completed21.04.2007
OperatorMarathon Petroleum Norge AS
Position59,5467 N, 1,9884 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Alvheim gradient | 31,8 °C/km |
| Estimated at total depth from the gradient | 72 °C |
The gradient is the median of 6 released wells in Alvheim with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 24/6-B-3 AY1H same well | 0,0 | 5 012,0 | - | - | 2007 |
| 24/6-B-3 AY2H same well | 0,0 | 5 017,0 | - | - | 2008 |
| 24/6-B-1 AH | 0,0 | 3 070,0 | - | - | 2007 |
| 24/6-B-1 BH | 0,0 | 3 249,0 | - | - | 2007 |
| 24/6-B-1 CH | 0,0 | 4 765,0 | - | - | 2007 |
| 24/6-B-1 H | 0,0 | 2 995,0 | - | - | 2006 |
| 24/6-B-4 AY1H | 0,0 | 5 621,0 | - | - | 2010 |
| 24/6-B-4 AY2H | 0,0 | 5 864,0 | - | - | 2010 |
Casing and formation tests
No casing programme is reported for this wellbore.