24/6-B-1 H
Development, observationPlugged
Drilled by Marathon Petroleum Norge AS with DEEPSEA BERGEN decom in Alvheim, 06.12.2006 to 01.01.2007 (26 days), to 2 995,0 m.
Water depth123,0 m
Total depth2 995,0 m MD
Vertical depth2 268,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table23,0 m
Formation at total depth-
RigDEEPSEA BERGEN decom
Spud06.12.2006
Completed01.01.2007
OperatorMarathon Petroleum Norge AS
Position59,5465 N, 1,9887 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Alvheim gradient | 31,8 °C/km |
| Estimated at total depth from the gradient | 72 °C |
The gradient is the median of 6 released wells in Alvheim with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 24/6-B-1 AH same well | 0,0 | 3 070,0 | - | - | 2007 |
| 24/6-B-1 BH same well | 0,0 | 3 249,0 | - | - | 2007 |
| 24/6-B-1 CH same well | 0,0 | 4 765,0 | - | - | 2007 |
| 24/6-B-3 AY1H | 0,0 | 5 012,0 | - | - | 2007 |
| 24/6-B-3 AY2H | 0,0 | 5 017,0 | - | - | 2008 |
| 24/6-B-3 H | 0,0 | 2 834,0 | - | - | 2007 |
| 24/6-B-2 AY1H | 0,0 | 4 713,0 | - | - | 2008 |
| 24/6-B-2 AY2H | 0,0 | 4 303,0 | - | - | 2008 |
Casing and formation tests
No casing programme is reported for this wellbore.