Fields / 24/9-14 A
24/9-14 A
Exploration, appraisalPlugged and abandonedOil and gas
Drilled by Aker BP ASA with Scarabeo 8, 23.02.2019 to 13.03.2019 (18 days), to 4 432,0 m in the Hordaland Group.
Water depth119,5 m
Total depth4 432,0 m MD
Vertical depth1 881,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table34,0 m
Formation at total depthHordaland Group
RigScarabeo 8
Spud23.02.2019
Completed13.03.2019
OperatorAker BP ASA
Position59,3644 N, 1,7812 E
Formations
9 tops reported, measured depth in metres.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 24/9-14 S same well | 0,0 | 2 286,0 | 68 °C | 1,50 | 2019 |
| 24/9-3 | 1,1 | 3 051,0 | 75 °C | 1,32 | 1981 |
| 24/9-4 | 2,8 | 2 208,0 | 44 °C | 1,41 | 1991 |
| 24/9-12 A | 3,2 | 3 000,0 | - | 1,42 | 2018 |
| 24/9-12 B | 3,2 | - | - | - | - |
| 24/9-12 S | 3,2 | 2 336,0 | 70 °C | 1,39 | 2017 |
| 24/9-M-6 Y1H | 3,6 | 3 442,0 | - | - | 2022 |
| 24/9-M-6 Y2H | 3,6 | 4 092,0 | - | - | 2022 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Intermediate | 13 3/8" | 1 509,0 | 12 1/4" | 1 517,0 | 1,52 FIT |
| Liner | 10 3/4" | 1 912,0 | 9 1/2" | 1 920,0 | 1,56 FIT |