Fields / 24/9-14 S
24/9-14 S
Exploration, wildcatPlugged and abandonedOil and gas
Drilled by Aker BP ASA with Scarabeo 8, 19.01.2019 to 22.02.2019 (34 days), to 2 286,0 m in the Sele Formation.
Water depth119,5 m
Total depth2 286,0 m MD
Vertical depth2 131,0 m TVD
Bottom-hole temperature68 °C
Max inclination37,4°
Rotary table34,0 m
Formation at total depthSele Formation
RigScarabeo 8
Spud19.01.2019
Completed22.02.2019
OperatorAker BP ASA
Position59,3644 N, 1,7812 E
Formations
14 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 68 °C |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 24/9-14 A same well | 0,0 | 4 432,0 | - | - | 2019 |
| 24/9-3 | 1,1 | 3 051,0 | 75 °C | 1,32 | 1981 |
| 24/9-4 | 2,8 | 2 208,0 | 44 °C | 1,41 | 1991 |
| 24/9-12 A | 3,2 | 3 000,0 | - | 1,42 | 2018 |
| 24/9-12 B | 3,2 | - | - | - | - |
| 24/9-12 S | 3,2 | 2 336,0 | 70 °C | 1,39 | 2017 |
| 24/9-M-6 Y1H | 3,6 | 3 442,0 | - | - | 2022 |
| 24/9-M-6 Y2H | 3,6 | 4 092,0 | - | - | 2022 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 216,4 | 36" | 218,6 | - |
| Intermediate | 13 3/8" | 1 549,0 | 17 1/2" | 1 558,0 | 1,59 FIT |
| Intermediate | 9 5/8" | 1 783,0 | 12 1/4" | 1 789,0 | 1,49 FIT |
| Open hole | - | 2 145,0 | 8 1/2" | 2 145,0 | - |
Mud weight
14 measurements, one dot each, 1,00 to 1,50 g/cm³ against measured depth, brine, oil, water.