25/10-1 R
Exploration, appraisalPlugged and abandonedShows
Drilled by Esso Exploration and Production Norway A/S with Glomar Grand Isle in Balder, 09.07.1970 to 03.08.1970 (25 days), to 2 091,0 m in the Statfjord Group.
Water depth124,0 m
Total depth2 091,0 m MD
Vertical depth2 091,0 m TVD
Bottom-hole temperature76 °C
Max inclination6,0°
Rotary table10,0 m
Formation at total depthStatfjord Group
RigGlomar Grand Isle
Spud09.07.1970
Completed03.08.1970
OperatorEsso Exploration and Production Norway A/S
Position59,1894 N, 2,3200 E
Formations
31 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 76 °C |
| Balder gradient | 33,9 °C/km |
| Estimated at total depth from the gradient | 70 °C |
The gradient is the median of 29 released wells in Balder with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/10-1 same well | 0,0 | 1 747,0 | 76 °C | 1,14 | 1969 |
| 25/10-4 | 0,6 | 2 349,0 | 60 °C | 1,20 | 1980 |
| 25/10-4 R | 0,6 | 2 550,0 | 75 °C | 1,20 | 1981 |
| 25/11-U-9 | 0,6 | 146,2 | - | - | 1999 |
| 25/11-U-10 | 0,6 | 145,5 | - | - | 1999 |
| 25/11-U-29 | 0,9 | 128,9 | - | - | 1999 |
| 25/11-U-28 | 0,9 | 129,0 | - | - | 1999 |
| 25/11-U-27 | 0,9 | 128,1 | - | - | 1999 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Open hole | - | 2 092,0 | 8 1/2" | 2 092,0 | - |