Fields / 25/11-U-9
25/11-U-9
Other, soil drillingPlugged and abandoned
Drilled by Esso Exploration and Production Norway A/S with Fugro I, 19.08.1999 to 04.09.1999 (16 days), to 146,2 m.
Water depth125,2 m
Total depth146,2 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table-
Formation at total depth-
RigFugro I
Spud19.08.1999
Completed04.09.1999
OperatorEsso Exploration and Production Norway A/S
Position59,1949 N, 2,3207 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/11-U-10 | 0,0 | 145,5 | - | - | 1999 |
| 25/10-1 | 0,6 | 1 747,0 | 76 °C | 1,14 | 1969 |
| 25/10-1 R | 0,6 | 2 091,0 | 76 °C | - | 1970 |
| 25/10-4 | 0,7 | 2 349,0 | 60 °C | 1,20 | 1980 |
| 25/10-4 R | 0,7 | 2 550,0 | 75 °C | 1,20 | 1981 |
| 25/11-U-28 | 0,8 | 129,0 | - | - | 1999 |
| 25/11-U-29 | 0,8 | 128,9 | - | - | 1999 |
| 25/11-U-27 | 0,8 | 128,1 | - | - | 1999 |
Casing and formation tests
No casing programme is reported for this wellbore.