25/10-4
Exploration, appraisalSuspendedOil
Drilled by Esso Exploration and Production Norway A/S with Glomar Biscay Ii in Balder, 08.12.1980 to 18.01.1981 (41 days), to 2 349,0 m in the Zechstein Group.
Water depth126,0 m
Total depth2 349,0 m MD
Vertical depth2 348,0 m TVD
Bottom-hole temperature60 °C
Max inclination4,0°
Rotary table25,0 m
Formation at total depthZechstein Group
RigGlomar Biscay Ii
Spud08.12.1980
Completed18.01.1981
OperatorEsso Exploration and Production Norway A/S
Position59,1904 N, 2,3304 E
Formations
27 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 60 °C |
| Balder gradient | 33,9 °C/km |
| Estimated at total depth from the gradient | 79 °C |
The gradient is the median of 29 released wells in Balder with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/10-4 R same well | 0,0 | 2 550,0 | 75 °C | 1,20 | 1981 |
| 25/11-U-29 | 0,4 | 128,9 | - | - | 1999 |
| 25/11-U-28 | 0,4 | 129,0 | - | - | 1999 |
| 25/11-U-27 | 0,4 | 128,1 | - | - | 1999 |
| 25/10-1 | 0,6 | 1 747,0 | 76 °C | 1,14 | 1969 |
| 25/10-1 R | 0,6 | 2 091,0 | 76 °C | - | 1970 |
| 25/11-U-10 | 0,7 | 145,5 | - | - | 1999 |
| 25/11-U-9 | 0,7 | 146,2 | - | - | 1999 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 214,0 | 36" | 214,0 | - |
| Intermediate | 13 3/8" | 497,0 | 17 1/2" | 512,0 | 1,68 LOT |
| Intermediate | 9 5/8" | 1 288,5 | 12 1/4" | 1 305,0 | 1,71 LOT |
| Liner | 7" | 2 279,0 | 8 1/2" | 2 349,0 | 1,63 LOT |
Mud weight
7 measurements, one dot each, 1,00 to 1,20 g/cm³ against measured depth, seawater, waterbased.