Fields / 25/10-U-9
25/10-U-9
Other, shallow gasPlugged
Drilled by Aker BP ASA with Scarabeo 8, 11.01.2023 to 12.01.2023 (1 days).
Water depth116,0 m
Total depth-
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table34,0 m
Formation at total depth-
RigScarabeo 8
Spud11.01.2023
Completed12.01.2023
OperatorAker BP ASA
Position59,0230 N, 2,0793 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/10-17 S | 0,0 | 4 150,0 | 146 °C | 1,47 | 2023 |
| 16/1-1 | 4,6 | 3 203,0 | 95 °C | - | 1967 |
| 16/1-33 S | 7,4 | 3 158,0 | - | - | 2020 |
| 25/10-7 S | 7,5 | 2 617,0 | 87 °C | 1,39 | 1996 |
| 25/10-8 | 8,3 | 2 653,0 | - | 1,75 | 1997 |
| 25/10-8 A | 8,3 | 3 460,0 | - | 1,75 | 1997 |
| 25/10-16 A | 8,7 | 3 704,0 | - | 1,39 | 2018 |
| 25/10-16 B | 8,7 | 4 893,0 | - | 1,39 | 2018 |
Casing and formation tests
No casing programme is reported for this wellbore.