25/11-12
Exploration, appraisalPlugged and abandonedShows
Drilled by Esso Exploration and Production Norway A/S with Glomar Biscay Ii in Balder, 18.04.1981 to 07.05.1981 (19 days), to 1 918,0 m in the Ekofisk Formation.
Water depth127,0 m
Total depth1 918,0 m MD
Vertical depth1 918,0 m TVD
Bottom-hole temperature60 °C
Max inclination1,4°
Rotary table25,0 m
Formation at total depthEkofisk Formation
RigGlomar Biscay Ii
Spud18.04.1981
Completed07.05.1981
OperatorEsso Exploration and Production Norway A/S
Position59,2007 N, 2,3810 E
Formations
18 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 60 °C |
| Balder gradient | 33,9 °C/km |
| Estimated at total depth from the gradient | 64 °C |
The gradient is the median of 29 released wells in Balder with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/11-U-1 | 0,3 | - | - | - | 1974 |
| 25/11-U-2 | 0,3 | - | - | - | 1974 |
| 25/11-U-26 | 0,7 | 130,6 | - | - | 1999 |
| 25/11-U-25 | 0,8 | 131,0 | - | - | 1999 |
| 25/11-U-24 | 0,8 | 130,9 | - | - | 1999 |
| 25/11-U-30 | 0,9 | 130,3 | - | - | 1999 |
| 25/11-5 | 0,9 | 2 164,0 | 60 °C | 1,23 | 1974 |
| 25/11-U-23 | 1,0 | 131,2 | - | - | 1999 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 226,0 | 36" | 226,0 | - |
| Intermediate | 13 3/8" | 446,5 | 17 1/2" | 460,0 | 1,77 LOT |
| Intermediate | 9 5/8" | 1 301,0 | 12 1/4" | 1 315,0 | 1,75 LOT |
| Open hole | - | 1 918,0 | 8 1/2" | 1 918,0 | - |
Mud weight
4 measurements, one dot each, 1,00 to 1,19 g/cm³ against measured depth, waterbased.