25/11-5
Exploration, appraisalPlugged and abandonedOil
Drilled by Esso Exploration and Production Norway A/S with Drillmaster in Balder, 03.04.1974 to 08.05.1974 (35 days), to 2 164,0 m in the No Group Defined.
Formations
22 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 60 °C |
| Balder gradient | 33,9 °C/km |
| Estimated at total depth from the gradient | 72 °C |
The gradient is the median of 29 released wells in Balder with a reported bottom-hole temperature, counted from 4 °C at the sea floor. The vertical depth is not reported, so the measured depth is used and the estimate errs high.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/11-U-1 | 0,8 | - | - | - | 1974 |
| 25/11-U-2 | 0,8 | - | - | - | 1974 |
| 25/11-12 | 0,9 | 1 918,0 | 60 °C | 1,19 | 1981 |
| 25/11-U-26 | 1,2 | 130,6 | - | - | 1999 |
| 25/11-A-5 AH | 1,3 | 3 068,0 | - | - | 1996 |
| 25/11-A-5 BH | 1,3 | 2 988,0 | - | - | 1997 |
| 25/11-A-5 H | 1,3 | 2 502,0 | - | - | 1996 |
| 25/11-A-19 AH | 1,3 | 3 791,0 | - | - | 2001 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 187,0 | 36" | 190,0 | - |
| Surface casing | 13 3/8" | 397,0 | 17 1/2" | 411,0 | - |
| Intermediate | 9 5/8" | 1 397,0 | 12 1/4" | 1 412,0 | - |
| Liner | 7" | 1 890,0 | 8 1/2" | 2 164,0 | - |
Mud weight
2 measurements, one dot each, 1,20 to 1,23 g/cm³ against measured depth, seawater/lg, water/spers.
Drill-stem tests
Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.
| Test | Interval, m | Choke | Pressure | Temp. | Oil | Gas |
|---|---|---|---|---|---|---|
| 1 | 1 750,0 - 1 765,0 | - | - | - | 636 | 28 371 |