WellplannerNorwegian shelf well data

Fields / 25/11-U-26

25/11-U-26

Other, unknownPlugged and abandoned

Drilled by Esso Exploration and Production Norway A/S with Fugro I, 19.08.1999 to 04.09.1999 (16 days), to 130,6 m.

Water depth127,7 m
Total depth130,6 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table-
Formation at total depth-
RigFugro I
Spud19.08.1999
Completed04.09.1999
OperatorEsso Exploration and Production Norway A/S
Position59,2068 N, 2,3850 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-

The wellbore is not in a field, so no field gradient applies.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
25/11-U-250,1131,0--1999
25/11-U-240,1130,9--1999
25/11-U-230,4131,2--1999
25/11-U-10,6---1974
25/11-U-20,6---1974
25/11-120,71 918,060 °C1,191981
25/11-51,22 164,060 °C1,231974
25/11-19 S1,22 250,0-1,421995

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗