25/11-14 SR
Exploration, appraisalReclassified to testOil
Drilled by Esso Exploration and Production Norway A/S with Dyvi Stena in Balder, 19.10.1990 to 31.12.1990 (73 days), to 2 081,0 m in the Heimdal Formation.
Water depth127,0 m
Total depth2 081,0 m MD
Vertical depth1 801,3 m TVD
Bottom-hole temperature79 °C
Max inclination58,0°
Rotary table25,0 m
Formation at total depthHeimdal Formation
RigDyvi Stena
Spud19.10.1990
Completed31.12.1990
OperatorEsso Exploration and Production Norway A/S
Position59,1881 N, 2,3699 E
Formations
13 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 79 °C |
| Drill-stem test at 2 015,2 m | 75 °C |
| Balder gradient | 33,9 °C/km |
| Estimated at total depth from the gradient | 60 °C |
The gradient is the median of 29 released wells in Balder with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/11-14 S same well | 0,0 | 1 908,0 | 85 °C | 1,50 | 1990 |
| 25/11-8 | 0,5 | 1 950,0 | 77 °C | 1,15 | 1979 |
| 25/11-A-6 AH | 0,6 | 3 614,0 | - | - | 2001 |
| 25/11-A-6 H | 0,6 | 1 807,0 | - | - | 1996 |
| 25/11-A-20 AH | 0,6 | 4 356,0 | - | - | 2001 |
| 25/11-A-20 H | 0,6 | 5 086,0 | - | - | 2001 |
| 25/11-A-4 AH | 0,7 | 2 122,0 | - | - | 1996 |
| 25/11-A-4 BH | 0,7 | 2 923,0 | - | - | 2001 |
Casing and formation tests
No casing programme is reported for this wellbore.
Drill-stem tests
Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.
| Test | Interval, m | Choke | Pressure | Temp. | Oil | Gas |
|---|---|---|---|---|---|---|
| 1 | 1 998,2 - 2 015,2 | 13,7 | - | 75 | 508 | 2 000 |
| 2 | 1 999,2 - 2 015,2 | 25,4 | - | 76 | 985 | - |