Fields / Balder / 25/11-FT-2 Y2H
25/11-FT-2 Y2H
Development, productionClosed
Drilled by Vår Energi ASA with COSLPioneer in Balder, 16.12.2025 to 09.01.2026 (24 days), to 5 762,0 m.
Water depth128,7 m
Total depth5 762,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table25,1 m
Formation at total depth-
RigCOSLPioneer
Spud16.12.2025
Completed09.01.2026
OperatorVår Energi ASA
Position59,2187 N, 2,4256 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Balder gradient | 33,9 °C/km |
| Estimated at total depth from the gradient | 194 °C |
The gradient is the median of 29 released wells in Balder with a reported bottom-hole temperature, counted from 4 °C at the sea floor. The vertical depth is not reported, so the measured depth is used and the estimate errs high.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/11-FT-2 H same well | 0,0 | 5 734,0 | - | - | 2022 |
| 25/11-FT-3 H | 0,0 | 3 645,0 | - | - | 2022 |
| 25/11-FT-1 H | 0,0 | 3 219,0 | - | - | 2022 |
| 25/11-FT-4 AH | 0,0 | 4 116,0 | - | - | 2023 |
| 25/11-FT-4 H | 0,0 | 4 593,0 | - | - | 2022 |
| 25/11-U-36 | 0,4 | 132,1 | - | - | 1999 |
| 25/11-U-35 | 0,4 | 132,3 | - | - | 1999 |
| 25/11-U-37 | 0,5 | 130,9 | - | - | 1999 |
Casing and formation tests
No casing programme is reported for this wellbore.