Fields / 25/11-U-35
25/11-U-35
Other, unknownPlugged and abandoned
Drilled by Esso Exploration and Production Norway A/S with Fugro I, 19.08.1999 to 04.09.1999 (16 days), to 132,3 m.
Water depth129,3 m
Total depth132,3 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table-
Formation at total depth-
RigFugro I
Spud19.08.1999
Completed04.09.1999
OperatorEsso Exploration and Production Norway A/S
Position59,2226 N, 2,4280 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/11-U-36 | 0,0 | 132,1 | - | - | 1999 |
| 25/11-FT-2 H | 0,4 | 5 734,0 | - | - | 2022 |
| 25/11-FT-2 Y2H | 0,4 | 5 762,0 | - | - | 2025 |
| 25/11-FT-1 H | 0,4 | 3 219,0 | - | - | 2022 |
| 25/11-FT-3 H | 0,5 | 3 645,0 | - | - | 2022 |
| 25/11-FT-4 AH | 0,5 | 4 116,0 | - | - | 2023 |
| 25/11-FT-4 H | 0,5 | 4 593,0 | - | - | 2022 |
| 25/11-U-37 | 1,0 | 130,9 | - | - | 1999 |
Casing and formation tests
No casing programme is reported for this wellbore.