WellplannerNorwegian shelf well data

Fields / Balder / 25/11-FT-4 H

25/11-FT-4 H

Development, observationPlugged

Drilled by Vår Energi AS with West Phoenix in Balder, 12.06.2022 to 04.11.2022 (145 days), to 4 593,0 m.

Water depth128,7 m
Total depth4 593,0 m MD
Vertical depth1 795,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table38,6 m
Formation at total depth-
RigWest Phoenix
Spud12.06.2022
Completed04.11.2022
OperatorVår Energi AS
Position59,2187 N, 2,4254 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Balder gradient33,9 °C/km
Estimated at total depth from the gradient59 °C

The gradient is the median of 29 released wells in Balder with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
25/11-FT-4 AH same well0,04 116,0--2023
25/11-FT-1 H0,03 219,0--2022
25/11-FT-3 H0,03 645,0--2022
25/11-FT-2 H0,05 734,0--2022
25/11-FT-2 Y2H0,05 762,0--2025
25/11-U-360,5132,1--1999
25/11-U-350,5132,3--1999
25/11-U-370,5130,9--1999

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗