25/2-19 S
Exploration, appraisalPlugged and abandonedOil
Drilled by Aker BP ASA with Maersk Interceptor in Hugin, 27.08.2017 to 11.09.2017 (15 days), to 2 380,0 m in the Sele Formation.
Water depth120,5 m
Total depth2 380,0 m MD
Vertical depth2 265,0 m TVD
Bottom-hole temperature77 °C
Max inclination33,3°
Rotary table55,0 m
Formation at total depthSele Formation
RigMaersk Interceptor
Spud27.08.2017
Completed11.09.2017
OperatorAker BP ASA
Position59,8745 N, 2,6293 E
Formations
16 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 77 °C |
| Hugin gradient | 29,6 °C/km |
| Estimated at total depth from the gradient | 66 °C |
The gradient is the median of 6 released wells in Hugin with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/2-19 A same well | 0,0 | 4 210,0 | - | 1,34 | 2017 |
| 25/2-17 | 1,0 | 2 193,0 | 67 °C | 1,23 | 2009 |
| 25/2-25 A | 2,7 | 7 470,0 | - | - | 2024 |
| 25/2-25 AY2 | 2,7 | 4 503,0 | - | - | 2024 |
| 25/2-25 B | 2,7 | 8 513,0 | - | - | 2024 |
| 25/2-25 BY2 | 2,7 | 5 499,0 | - | - | 2024 |
| 25/2-25 S | 2,7 | 2 116,0 | - | - | 2024 |
| 25/2-U-13 | 2,7 | 1 103,0 | - | - | 2023 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 22" | 214,2 | 26" | 224,0 | - |
| Intermediate | 13 3/8" | 1 091,0 | 17 1/2" | 1 102,0 | 1,52 FIT |
| Pilot hole | - | 1 102,0 | 9 7/8" | 1 102,0 | - |
| Liner | 9 5/8" | 2 047,0 | 12 1/4" | 2 053,0 | 1,51 FIT |
| Open hole | - | 2 380,0 | 8 1/2" | 2 380,0 | - |
Mud weight
5 measurements, one dot each, 1,20 to 1,36 g/cm³ against measured depth, ems-4600 obm.