25/4-2
Exploration, wildcatPlugged and abandonedOil
Drilled by Elf Petroleum Norge AS with Neptune 7 in Tyrving, 18.10.1973 to 06.12.1973 (49 days), to 2 775,0 m in the Jorsalfare Formation.
Water depth121,0 m
Total depth2 775,0 m MD
Vertical depth-
Bottom-hole temperature57 °C
Max inclination-
Rotary table23,0 m
Formation at total depthJorsalfare Formation
RigNeptune 7
Spud18.10.1973
Completed06.12.1973
OperatorElf Petroleum Norge AS
Position59,5963 N, 2,3143 E
Formations
16 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 57 °C |
2 released wells in Tyrving report a bottom-hole temperature at 1,000 m or more below the sea floor; 3 are needed to estimate the temperature.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/5-I-1 AY1H | 2,4 | 4 941,0 | - | - | 2024 |
| 25/5-I-1 AY2H | 2,4 | 4 768,0 | - | - | 2024 |
| 25/5-I-1 H | 2,4 | 2 702,0 | - | - | 2024 |
| 25/5-5 | 4,9 | 2 600,0 | 89 °C | 1,26 | 1995 |
| 25/5-8 | 5,2 | 1 199,0 | - | 1,20 | 2013 |
| 25/5-9 | 5,2 | 2 265,0 | 83 °C | 1,35 | 2014 |
| 25/4-A-4 | 5,4 | 2 740,0 | - | - | 1985 |
| 25/4-A-5 | 5,4 | 2 203,0 | - | - | 1985 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 181,0 | 36" | 181,0 | - |
| Surface casing | 13 3/8" | 468,0 | 17 1/2" | 475,0 | - |
| Intermediate | 9 5/8" | 2 026,0 | 12 1/4" | 2 080,0 | - |
| Open hole | - | 2 775,0 | 8 1/2" | 2 775,0 | - |
Mud weight
6 measurements, one dot each, 1,20 to 1,27 g/cm³ against measured depth, seawater.