25/5-I-1 H
Development, observationPluggedOil
Drilled by Aker BP ASA with Deepsea Nordkapp in Tyrving, 28.04.2024 to 04.05.2024 (6 days), to 2 702,0 m.
Water depth118,4 m
Total depth2 702,0 m MD
Vertical depth2 303,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table32,6 m
Formation at total depth-
RigDeepsea Nordkapp
Spud28.04.2024
Completed04.05.2024
OperatorAker BP ASA
Position59,5934 N, 2,3559 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
2 released wells in Tyrving report a bottom-hole temperature at 1,000 m or more below the sea floor; 3 are needed to estimate the temperature.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 25/5-I-1 AY1H same well | 0,0 | 4 941,0 | - | - | 2024 |
| 25/5-I-1 AY2H same well | 0,0 | 4 768,0 | - | - | 2024 |
| 25/4-2 | 2,4 | 2 775,0 | 57 °C | 1,27 | 1973 |
| 25/5-9 | 3,6 | 2 265,0 | 83 °C | 1,35 | 2014 |
| 25/5-8 | 3,6 | 1 199,0 | - | 1,20 | 2013 |
| 25/5-5 | 4,4 | 2 600,0 | 89 °C | 1,26 | 1995 |
| 25/5-H-1 AH | 6,0 | 2 885,0 | - | - | 2024 |
| 25/5-H-1 BY1H | 6,0 | 5 660,0 | - | - | 2024 |
Casing and formation tests
No casing programme is reported for this wellbore.