25/4-C-1 AH
Development, productionClosedGas and condensate
Drilled by Norsk Hydro Produksjon AS with Deepsea Delta in Vale, 21.05.2005 to 26.08.2005 (97 days), to 5 212,0 m.
Water depth114,0 m
Total depth5 212,0 m MD
Vertical depth3 796,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table29,0 m
Formation at total depth-
RigDeepsea Delta
Spud21.05.2005
Completed26.08.2005
OperatorNorsk Hydro Produksjon AS
Position59,7062 N, 2,3105 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
2 released wells in Vale report a bottom-hole temperature at 1,000 m or more below the sea floor; 3 are needed to estimate the temperature.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.