25/4-C-1 H
Development, productionPluggedGas
Drilled by Norsk Hydro Produksjon AS with Scarabeo 6 in Vale, 25.05.2001 to 08.07.2001 (44 days), to 4 004,0 m.
Water depth116,0 m
Total depth4 004,0 m MD
Vertical depth3 909,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table26,0 m
Formation at total depth-
RigScarabeo 6
Spud25.05.2001
Completed08.07.2001
OperatorNorsk Hydro Produksjon AS
Position59,7062 N, 2,3105 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
2 released wells in Vale report a bottom-hole temperature at 1,000 m or more below the sea floor; 3 are needed to estimate the temperature.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.