Fields / 25/6-5 S
25/6-5 S
Exploration, wildcatPlugged and abandonedGas and condensate
Drilled by Total E&P Norge AS with Leiv Eiriksson, 13.03.2015 to 10.04.2015 (28 days), to 2 520,0 m in the Dunlin Group.
Water depth120,0 m
Total depth2 520,0 m MD
Vertical depth2 391,0 m TVD
Bottom-hole temperature-
Max inclination35,2°
Rotary table25,0 m
Formation at total depthDunlin Group
RigLeiv Eiriksson
Spud13.03.2015
Completed10.04.2015
OperatorTotal E&P Norge AS
Position59,5909 N, 2,7610 E
Formations
16 tops reported, measured depth in metres.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 212,0 | 36" | 218,0 | - |
| Intermediate | 13 3/8" | 1 204,0 | 17 1/2" | 1 211,0 | - |
| - | - | 1 214,0 | - | 1 214,0 | 1,52 FIT |
| Liner | 9 5/8" | 2 372,0 | 12 1/4" | 2 378,0 | - |
| Open hole | - | 2 520,0 | 8 1/2" | 2 520,0 | - |
Mud weight
9 measurements, one dot each, 1,00 to 1,45 g/cm³ against measured depth, glydril, kcl/polymer, spud mud.