25/5-B-1 H
Development, productionPluggedGas
Drilled by TotalFinaElf Exploration Norge AS with Scarabeo 6 in Skirne, 05.02.2003 to 26.04.2003 (80 days), to 3 173,0 m.
Water depth118,0 m
Total depth3 173,0 m MD
Vertical depth2 397,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table26,0 m
Formation at total depth-
RigScarabeo 6
Spud05.02.2003
Completed26.04.2003
OperatorTotalFinaElf Exploration Norge AS
Position59,5844 N, 2,6411 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
2 released wells in Skirne report a bottom-hole temperature at 1,000 m or more below the sea floor; 3 are needed to estimate the temperature.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.