Fields / Skirne / 25/5-3
25/5-3
Exploration, wildcatPlugged and abandonedGas and condensate
Drilled by Elf Petroleum Norge AS with West Vanguard in Skirne, 27.01.1990 to 26.03.1990 (58 days), to 2 900,0 m in the No Group Defined.
Water depth118,0 m
Total depth2 900,0 m MD
Vertical depth2 900,0 m TVD
Bottom-hole temperature94 °C
Max inclination1,1°
Rotary table22,0 m
Formation at total depthNo Group Defined
RigWest Vanguard
Spud27.01.1990
Completed26.03.1990
OperatorElf Petroleum Norge AS
Position59,5856 N, 2,6297 E
Formations
25 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 94 °C |
2 released wells in Skirne report a bottom-hole temperature at 1,000 m or more below the sea floor; 3 are needed to estimate the temperature.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|
| 25/5-U-36 | 0,6 | - | - | - | - |
| 25/5-B-1 H | 0,7 | 3 173,0 | - | - | 2003 |
| 25/5-U-40 | 0,7 | - | - | - | - |
| 25/5-U-38 | 0,7 | - | - | - | - |
| 25/5-U-39 | 0,7 | - | - | - | - |
| 25/5-U-35 | 0,7 | - | - | - | - |
| 25/5-U-37 | 0,7 | - | - | - | - |
| 25/6-5 S | 7,4 | 2 520,0 | - | 1,45 | 2015 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|
| Conductor | 30" | 138,5 | 36" | 140,0 | - |
| Intermediate | 13 3/8" | 1 176,0 | 17 1/2" | 1 180,0 | - |
| Intermediate | 9 5/8" | 2 350,0 | 12 1/4" | 2 355,0 | - |
| Liner | 7" | 2 615,0 | 8 1/2" | 2 900,0 | - |
Mud weight
9 measurements, one dot each, 1,00 to 1,30 g/cm³ against measured depth, water based.
Drill-stem tests
Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.
| Test | Interval, m | Choke | Pressure | Temp. | Oil | Gas |
|---|
| 1 | 2 405,0 - 2 336,0 | 11,1 | 23,0 | - | 57 | 585 000 |