25/5-U-35
Other, soil drillingStatus not given
Drilled by TotalEnergies EP Norge AS with Fugro Synergy in Skirne.
Water depth118,0 m
Total depth-
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table4,1 m
Formation at total depth-
RigFugro Synergy
Spud-
Completed-
OperatorTotalEnergies EP Norge AS
Position59,5843 N, 2,6419 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
2 released wells in Skirne report a bottom-hole temperature at 1,000 m or more below the sea floor; 3 are needed to estimate the temperature.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.