Fields / 25/6-6 S
25/6-6 S
Exploration, wildcatPlugged and abandonedDry
Drilled by Equinor Energy AS with Transocean Spitsbergen, 28.03.2019 to 22.04.2019 (25 days), to 3 546,0 m in the Hegre Group.
Water depth123,0 m
Total depth3 546,0 m MD
Vertical depth3 495,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table40,0 m
Formation at total depthHegre Group
RigTransocean Spitsbergen
Spud28.03.2019
Completed22.04.2019
OperatorEquinor Energy AS
Position59,5098 N, 2,9141 E
Formations
32 tops reported, measured depth in metres.
Temperature
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|
| 25/6-1 | 6,6 | 2 881,0 | 120 °C | 1,33 | 1985 |
| 25/6-2 | 7,8 | 2 392,0 | 82 °C | 1,35 | 1992 |
| 25/9-4 | 12,0 | 2 419,0 | - | 1,60 | 2014 |
| 25/6-5 S | 12,5 | 2 520,0 | - | 1,45 | 2015 |
| 26/4-1 | 12,7 | 3 690,0 | 128 °C | 1,92 | 1987 |
| 25/9-1 | 13,3 | 2 525,0 | 91 °C | 1,28 | 1995 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|
| Conductor | 36" | 226,6 | 42" | 229,4 | - |
| Intermediate | 13 3/8" | 986,2 | 17 1/2" | 993,0 | 1,57 FIT |
| Intermediate | 9 5/8" | 2 454,5 | 12 1/2" | 2 463,0 | 1,71 FIT |
| Open hole | - | 3 546,0 | 8 1/2" | 3 546,0 | - |
Mud weight
13 measurements, one dot each, 1,00 to 1,41 g/cm³ against measured depth, bentonite/polymer mud, kcl/polymer, xp-07.