Fields / 26/4-1
26/4-1
Exploration, wildcatPlugged and abandonedDry
Drilled by BP Norway Limited U.A. with Treasure Scout, 08.05.1987 to 17.07.1987 (70 days), to 3 690,0 m in the No Group Defined.
Water depth121,0 m
Total depth3 690,0 m MD
Vertical depth3 687,0 m TVD
Bottom-hole temperature128 °C
Max inclination7,8°
Rotary table23,0 m
Formation at total depthNo Group Defined
RigTreasure Scout
Spud08.05.1987
Completed17.07.1987
OperatorBP Norway Limited U.A.
Position59,6105 N, 3,0204 E
Formations
28 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 128 °C |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|
| 25/6-4 S | 11,4 | 2 950,0 | - | 1,49 | 2012 |
| 25/6-3 | 11,4 | 2 475,0 | 91 °C | 1,28 | 1999 |
| 25/6-2 | 12,5 | 2 392,0 | 82 °C | 1,35 | 1992 |
| 25/6-6 S | 12,7 | 3 546,0 | - | 1,41 | 2019 |
| 25/6-5 S | 14,8 | 2 520,0 | - | 1,45 | 2015 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|
| Surface casing | 20" | 711,0 | 26" | 873,0 | - |
| Intermediate | 13 3/8" | 1 675,0 | 17 1/2" | 1 680,0 | - |
| Intermediate | 8 3/8" | 2 667,0 | 12 1/4" | 2 681,0 | - |
| Open hole | - | 3 690,0 | 8 1/2" | 3 690,0 | - |
Mud weight
55 measurements, one dot each, 1,00 to 1,92 g/cm³ against measured depth, water based.